Sr. No. |
Key Acceptance Criteria |
Dimension |
Standard |
Method |
Note |
Observation |
Outcome |
Uploads |
(Level 1) Boiler Duct |
(Level 2) Material Identification and WPS/PQR/WPQ |
1 |
MATERIAL IDENTIFICATION - Review of MTC / Check Test Report |
|
Drg./Material Specs/Code/MTC |
Review |
100% Check |
Reviewed PMI Report |
Accept
|
|
2 |
Review & Verification of MTC w.r.to Material / Drg BOM |
|
Drg./Material Specs/Code |
Review |
100% Check |
Done OK |
Accept
|
|
3 |
Dimension Inspection, Verify Thickness of plate |
|
Drg./Material Specs/Code |
Measurement |
10% Check |
Thickness is within tolerance |
Accept
|
|
4 |
Surface Condition |
|
Free from surface defects/pitting |
Visual |
100% Check |
OK |
Accept
|
|
5 |
REVIEW OF WPS/PQR/WPQ - TPIA Witness for new PQR |
|
Drg./ASME Sec.IX/AWS D1.1 |
Review |
100% Check |
Reviewed |
Accept
|
|
6 |
Review of WPS / PQR |
|
Drg./ASME Sec.IX/AWS D1.1 |
Review |
100% Check |
Reviewed |
Accept
|
|
7 |
Review of WPQ |
|
Drg./ASME Sec.IX/AWS D1.1 |
Review |
100% Check |
Reviewed |
Accept
|
|
(Level 2) Final Inspection |
(Level 2) Painting Inspection |
(Level 2) Pre-Shipment and Release Note |
|
Final Observation | CAPA |
OK |
Rework
|