Material Drawing No. S10023-DD-TD-M-P-00
Stage - Surface Condition -
Technique Visible Solvent Removable
Product Make and Product Code Batch No. Expiry Date
Penetrant - 17K13 20-Oct-2020
Developer - 17K05 10-Jan-2022
Cleaner - 17M02 07-Dec-2022
Precleaning DONE Drying Time After Precleaning and
Before Penetrant Application
10 min
Penetrant Application Method By Brushing Dwell Time 20 Min
Removal Of Excess Penetrant DONE Drying Time Before Developer Application 10 Min
Developer Application Method By Brushing Developing and Interpretation Time 20 Min
Part Surface Temperature 35 °C Thermometer Sr. No: 201807023992, Validity: 23-Jan-2026
White Light Intensity
(Ensured With Lux Meter)
1200 Lux Lux Meter Sr. No: 17519965, Validity: 04-Jan-2026
Post Cleaning DONE Lighting Equipment LED Torch
Examination Extent Accessible area
Specification/Standard/Procedure As per Customer specification
Acceptance Standard    ASME Sec VIII Div.1 App. 8
OBSERVATION AND RESULTS
Sr. No. Description Qty Observation Evaluation
1 Valve-D-332 5 No recordable defects Accepted
2 Valve-D-331 1 No recordable incidence observed Accepted

Remark: As per SA 578

Note:

 
ID - 3830 PENETRATION EXAMINATION (V) REPORT REQ ID - AL123
Client Alfa Manufacturing Company Report No. IBTS/PT/3830
Address Gala 1, Industrial Area Revision 5
Report Date 02-Aug-2025
Component PT Visible Test Date 26-Nov-2020
Supplier A B Castings