NOI / E-mail Ref.
|
Expediting for Valve
|
NOI Date
|
2019-03-24
|
NOI By
|
|
Service Location
|
Sonawane Wasti, Gat No 69, Plot No 6 & 8, Talawade, Pune, Maharashtra
|
Visit Start Date
|
22-Mar-2019
|
Visit End Date
|
23-Mar-2019
|
Supplier Contact
|
Mr. RAVINDRA MADHUSUDHAN PATHAK
|
No. of Days
|
2
|
|
Sr. No.
|
Purchase Order Description
|
Item
|
P.O.Status
|
1
|
Refinery/75000-91356/JRV Dtd. 27.05.2019
|
Valve
|
Complete
|
|
Sr. No.
|
Previous Visit Date
|
Report No
|
1
|
25-Jan-2019
|
-
|
|
Description of Drg.|ITP|QAP|other Documents Referred During
Inspection
|
Sr. No.
|
Name of the document
|
Document No and Rev No
|
Approval Date
|
Approved by
|
Remarks
|
1
|
ITP
|
B224-FCC-LT-111-MS-PR-0034 R 02
|
10-Jan-2019
|
LTHE
|
-
|
|
Sr. No.
P.O. Line No.
|
Item Description
|
Inspection stage
|
P.O. Qty.
|
Inspected Qty.
|
Quantum of check in %
|
Tag No Of Inspected Item
|
Remarks
|
1
|
Valve
|
Finished
|
1
|
1
|
100
|
Equipment Tag. No.111-V-2502 , 3107, 2504, 3104, 2601, 2602, 3108, 2507, 2405 & 2202,1108, 4102, 4105, 1111, 2207, 2303, 2404, 2505 & 2506
|
-
|
|
Inspection Details with Description
|
Sr. No.
|
ITP | QAP Clause No.
|
Inspection Description (As per QAP Clause)
|
TPI Scope (W/R/H)
|
Result
|
1
|
5.1.0
|
Material clearance record , material identification & stamping – Plates, Pipes, Flanges, Forging
|
W
|
Accept
|
2
|
8.0.7
|
RT & PT Of completed welds
|
R
|
Accept
|
|
Inspection Note |
Reviewed vendor submitted MTC of offered Tags fitting material & flanges for Heat no, Make, material grade, Tag no. & size – found in order Material size verified as per standard specification for (Fittings-L x H x T) & (Flanges- OD, PCD, Thk & neck Sch) - Found in order. Reviewed RT REPORT / RT FILM of offered Tags for completed weld for weld defects as per RT procedure , drawing & QAP – found in order
|
|
Identifications. Inspected items are double stamped and others are single stamped
|
Sr. No.
|
Location of Stamping
|
Specimen
|
Remark
|
1
|
Near Tag Sr. No
|
CV
|
Single Stamping
|
|
Description of Calibration Details of Devices used During Inspection
|
Sr. No.
|
Device Description and Range
|
Device Sr. No.
|
Certificate No. and Date of Certification
|
Company Performing Calibration
|
Calibration Validity
|
NABL Traceability
|
1
|
Measuring Tape – 0 to 5 M
|
RI/UIII/5M/02
|
-
|
-
|
14.06.2022
|
Yes
|
2
|
Vernier Caliper- 0 to 300 mm
|
51019254
|
-
|
-
|
17.02.2022
|
Yes
|
|
Area of Concern / Conclusion
|
Sr. No.
|
Description
|
1
|
RT Film review – For Tag No. 3106- CS1- IJ (Joint ) - Repair
|
2
|
Offered Tag.No. 1108 Flange found Tag.No. 4108.
|
3
|
Most of the flanges observed without chamfering to Hole
|
4
|
Above 18 mm thk plate UT report not submitted for review
|
|
Additional Attachments for this Report
|
Sr. No.
|
Attachment Ref.
|
Description
|
1
|
1
|
Pictures submitted separately
|
|
|
Supplier |
|
Idea Brigade Technology Solutions LLP
|
Client |
Alfa Laval (I) Ltd., Pune
|
Name
|
|
Name
|
|
Name
|
|
Date |
-
|
Date |
-
|
Date |
-
|
Sign and Stamp
|
|
Sign and Stamp
|
|
Sign and Stamp
|
|
|
- The items are inspected in accordance with the Drawings/Standards/Codes and
Specifications
- This report does not relieve Manufacturer from the agreed responsibilities with
client
- Final acceptance and release shall be given by client after review
- Manufacturer is solely responsible for any Manufacturing Defects and Failures
- This report shall not be reproduced except in full without prior written permission